Replacement Multi-span Bridge
Flowerdale, Victoria
Black Geotechnical conducted a geotechnical investigation at the site, which included drilling boreholes at the proposed replacement bridge abutments and pier (through the existing bridge deck). The fieldwork was successfully completed in two days and the recommended footing option was rock-socketed piles.